Shenzhen Urban Rail Transit Power Pipeline Relocation and Restoration Project Line 14

(Summary description)Line 14 of Shenzhen Urban Rail Transit Power Pipeline Relocation and Restoration Project: The total length of the project is 52.46 kilometers and the cost is about 54 billion yuan.

Shenzhen Urban Rail Transit Power Pipeline Relocation and Restoration Project Line 14

(Summary description)Line 14 of Shenzhen Urban Rail Transit Power Pipeline Relocation and Restoration Project: The total length of the project is 52.46 kilometers and the cost is about 54 billion yuan.

Information

Line 14 of Shenzhen Urban Rail Transit Power Pipeline Relocation and Restoration Project: The total length of the project is 52.46 kilometers and the cost is about 54 billion yuan.

 

Project features:

1. This project is a key subway project in Shenzhen.

2. Multi-dimensional compound traffic, six floors of underground traffic space, and super high-rise buildings on the ground.

3. The difficulty of the construction of the project lies in the complex construction environment, the crisscrossing of the project, path planning, project communication and coordination, etc.

Scan the QR code to read on your phone

电话

Hotline

400-0832-838

Email:rongdian_2008@163.com
Add:Gukun Nano Industrial Park, No. 12 Dakeng Road, Tongle Community, Longgang District, Shenzhen

About us

公众号二维码

Scan it

公众号二维码

Follow me

Copyright © 2021 Shenzhen Rongdian Industrial Co., Ltd.  粤ICP备14007671号     Power by:300.cn  

Copyright © 2021 Shenzhen Rongdian Industrial Co., Ltd  粤ICP备14007671号      Power by:  300.cn