Malaysia JinkoSolar Co., Ltd. Penang Jinko Phase II Cell Workshop
Malaysia
Malaysia JinkoSolar Co., Ltd. Penang Jinko Phase II Cell Workshop: The project site is located in the Penang Industrial Zone, Malaysia, with a construction area of approximately 25,000 square meters.

See more information
Malaysia JinkoSolar Co., Ltd. Penang Jinko Phase II Cell Workshop: The project site is located in the Penang Industrial Zone, Malaysia, with a construction area of approximately 25,000 square meters.

Penang Jinko Battery Plant III Phase II
Penang
The second phase of Penang Jinko Battery Plant III: The project site is located in Penang Industrial Zone, Malaysia, with a construction area of approximately 25,000 square meters.
See more information
The second phase of Penang Jinko Battery Plant III: The project site is located in Penang Industrial Zone, Malaysia, with a construction area of approximately 25,000 square meters.
Indonesia low-voltage power distribution cabinet
Indonesia
Indonesia low-voltage power distribution cabinet: The project address is located in Indonesia.
See more information
Indonesia low-voltage power distribution cabinet: The project address is located in Indonesia.
Previous page
1
电话

Hotline

17722472125

Email:rongdian_2008@163.com
Add:3rd Floor, Building 3, No.42 Yanchun Road, Tongxin Community, Baolong Street, Longgang District, Shenzhen, China

About us

公众号二维码

Scan it

公众号二维码

Follow me

Copyright © 2021 Shenzhen Rongdian Industrial Co., Ltd.  粤ICP备14007671号     Power by:300.cn  

Copyright © 2021 Shenzhen Rongdian Industrial Co., Ltd  粤ICP备14007671号      Power by:  300.cn